Shuttle transportation system payload ground operations requirements and checkoutPayload ground operations and checkout verifications have become a major concern of STS scheduling operations. Ground scheduling techniques, interface verification simulators, and software verification tools will be used to minimize impact. The present paper discusses three such techniques: (1) baseline planning used for the STS system, (2) baseline operations concepts developed for the users, and (3) the necessary tools for implementation and analysis. Several payload schedules and flow charts are presented.
Document ID
19790033640
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Johnson, J. W. (NASA Kennedy Space Center Cocoa Beach, Fla., United States)