Spacelab development and its operational verificationThis paper gives a brief status report on the current Spacelab program and describes how the results of ground and flight tests will be combined to provide the operational verification of the system. For the on-going project, data on design, testing and fabrication plans are presented. In particular, recent changes to meet the constraints of a 'build-to-cost' project are described. In the operational verification of Spacelab, ground and flight tests which ESA and NASA will perform are addressed. The installation of test instrumentation and the performance of integrated tests will be accomplished in the US. Experiments for the first flight will be integrated into Spacelab racks and pallets and simulated mission tests performed. On-orbit, system thermal surveys are planned and stress data will be obtained during launch and re-entry.
Document ID
19790036753
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Bignier, M. (ESA Paris, France)
Lord, D. R. (NASA Headquarters Washington, DC United States)