NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
To the first Shuttle launchThe major Shuttle-related testing currently in progress includes: static testing of all major elements, full scale ground vibration testing, main propulsion system testing, software verification and validation, qualification testing of many components and subsystems, and SSME verification testing. This paper reviews the current status of the Shuttle program and gives attention to the transition to operations, near-term traffic plans, user-charge policies, and payload integration. It is concluded that the transition from individual space-research projects to a fully integrated Space Transportation System, providing low-cost routine access to space for many users, involves a complete rethinking of the role NASA and the user will play.
Document ID
19790039028
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Yardley, J. F.
(NASA Headquarters Washington, DC United States)
Date Acquired
August 9, 2013
Publication Date
February 1, 1979
Publication Information
Publication: Astronautics and Aeronautics
Volume: 17
Subject Category
Space Transportation
Accession Number
79A23041
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available