NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Shuttle orbital flight testThe initial orbital flight of the shuttle vehicle will involve several operational aspects which differ from previous manned space programs. The asymmetrical shuttle launch configuration undergoes unique aero and thrust loads. The orbiter requires a complex interactive control system during entry. Techniques are described which will be used to minimize the ascent loads. Procedures are outlined which should maximize the entry control margins. The primary objective of the first shuttle flight is to obtain data from which to extract the loads and stability derivatives. Accomplishment of this objective will enable relaxation of constraints on launch winds, entry center of gravity, and crossrange during subsequent flights.
Document ID
19790066432
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
North, W. J.
(NASA Johnson Space Center Flight Operations Directorate, Houston, Tex., United States)
Date Acquired
August 9, 2013
Publication Date
January 1, 1978
Subject Category
Space Transportation
Meeting Information
Meeting: Why flight test; Ninth Annual Symposium
Location: Arlington, TX
Start Date: October 4, 1978
End Date: October 6, 1978
Accession Number
79A50445
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available