NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Future large broadband switched satellite communications networksCritical technical, market, and policy issues relevant to future large broadband switched satellite networks are summarized. Our market projections for the period 1980 to 2000 are compared. Clusters of switched satellites, in lieu of large platforms, etc., are shown to have significant advantages. Analysis of an optimum terrestrial network architecture suggests the proper densities of ground stations and that link reliabilities 99.99% may entail less than a 10% cost premium for diversity protection at 20/30 GHz. These analyses suggest that system costs increase as the 0.6 power of traffic. Cost estimates for nominal 20/30 GHz satellite and ground facilities suggest optimum system configurations might employ satellites with 285 beams, multiple TDMA bands each carrying 256 Mbps, and 16 ft ground station antennas. A nominal development program is outlined.
Document ID
19800013137
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Staelin, D. H.
(Massachusetts Inst. of Tech. Cambridge, MA, United States)
Harvey, R. R.
(Massachusetts Inst. of Tech. Cambridge, MA, United States)
Date Acquired
September 4, 2013
Publication Date
December 1, 1979
Subject Category
Communications And Radar
Report/Patent Number
NASA-CR-159961
Report Number: NASA-CR-159961
Accession Number
80N21623
Funding Number(s)
CONTRACT_GRANT: NAS5-25091
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available