Storage peak gas-turbine power unitA storage gas-turbine power plant using a two-cylinder compressor with intermediate cooling is studied. On the basis of measured characteristics of a .25 Mw compressor computer calculations of the parameters of the loading process of a constant capacity storage unit (05.3 million cu m) were carried out. The required compressor power as a function of time with and without final cooling was computed. Parameters of maximum loading and discharging of the storage unit were calculated, and it was found that for the complete loading of a fully unloaded storage unit, a capacity of 1 to 1.5 million cubic meters is required, depending on the final cooling.
Document ID
19800013269
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Tsinkotski, B.
(NASA Headquarters Washington, DC United States)
Date Acquired
September 4, 2013
Publication Date
January 1, 1980
Subject Category
Mechanical Engineering
Report/Patent Number
NASA-TM-75757
Report Number: NASA-TM-75757
Accession Number
80N21755
Funding Number(s)
CONTRACT_GRANT: NASW-3198
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available