NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Automated array assembly, phase 2Tasks of scaling up the tandem junction cell (TJC) from 2 cm x 2 cm to 6.2 cm and the assembly of several modules using these large area TJC's are described. The scale-up of the TJC was based on using the existing process and doing the necessary design activities to increase the cell area to an acceptably large area. The design was carried out using available device models. The design was verified and sample large area TJCs were fabricated. Mechanical and process problems occurred causing a schedule slippage that resulted in contract expiration before enough large-area TJCs were fabricated to populate the sample tandem junction modules (TJM). A TJM design was carried out in which the module interconnects served to augment the current collecting buses on the cell. No sample TJMs were assembled due to a shortage of large-area TJCs.
Document ID
19800015279
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Carbajal, B. G.
(Texas Instruments, Inc. Dallas, TX, United States)
Date Acquired
September 4, 2013
Publication Date
November 1, 1979
Subject Category
Energy Production And Conversion
Report/Patent Number
DOE/JPL-95488-79/8
JPL-9950-319
REPT-03-79-58
NASA-CR-153191
Report Number: DOE/JPL-95488-79/8
Report Number: JPL-9950-319
Report Number: REPT-03-79-58
Report Number: NASA-CR-153191
Accession Number
80N23770
Funding Number(s)
CONTRACT_GRANT: JPL-954881
CONTRACT_GRANT: NAS7-100
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available