NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space construction system analysis study: Project systems and missions descriptionsThree project systems are defined and summarized. The systems are: (1) a Solar Power Satellite (SPS) Development Flight Test Vehicle configured for fabrication and compatible with solar electric propulsion orbit transfer; (2) an Advanced Communications Platform configured for space fabrication and compatible with low thrust chemical orbit transfer propulsion; and (3) the same Platform, configured to be space erectable but still compatible with low thrust chemical orbit transfer propulsion. These project systems are intended to serve as configuration models for use in detailed analyses of space construction techniques and processes. They represent feasible concepts for real projects; real in the sense that they are realistic contenders on the list of candidate missions currently projected for the national space program. Thus, they represent reasonable configurations upon which to base early studies of alternative space construction processes.
Document ID
19800018899
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
April 26, 1979
Subject Category
Astronautics (General)
Report/Patent Number
NASA-CR-160748
SSD-79-0077
Report Number: NASA-CR-160748
Report Number: SSD-79-0077
Accession Number
80N27400
Funding Number(s)
CONTRACT_GRANT: NAS9-15718
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available