NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Satellite Power Systems (SPS) concept definition study. Volume 5: Special emphasis studiesSatellite configurations based on the Satellite Power System baseline requirements were analyzed and a preferred concept selected. A satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Rectenna construction requirement were also addressed. Mass flow to orbit requirements were revised and traffic models established based on construction of 60 instead of 120 satellites. Analyses were conducted to determine satellite control, resources, manufacturing, and propellant requirements. The impact of the laser beam used for space-to-Earth power transmission upon the intervening atmosphere was examined as well as the inverse effect. The significant space environments and their effects on spacecraft components were investigated to define the design and operational limits imposed by the environments on an orbit transfer vehicle. The results show that LEO altitude 300 nmi and transfer orbit duration 6 months are preferrable.
Document ID
19800024353
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Hanley, G. M.
(Rockwell International Corp. Downey, CA, United States)
Date Acquired
September 4, 2013
Publication Date
September 1, 1980
Subject Category
Energy Production And Conversion
Report/Patent Number
NASA-CR-3322
SSD-79-0010-5
Report Number: NASA-CR-3322
Report Number: SSD-79-0010-5
Accession Number
80N32861
Funding Number(s)
CONTRACT_GRANT: NAS8-32475
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available