NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Shuttle Orbiter status - April 1980The Orbiter is in the final stages of preparation, proceeding toward mating with the other Shuttle flight hardware elements, preparatory to its maiden voyage. The first orbital vehicle, Columbia, has been undergoing manufacturing, modifications, and testing at KSC, and integrated vehicle processing is planned to continue prior to the planned STS-1 launch. In order to establish a national fleet of operational Orbiters, Space Shuttle production includes fabrication of two additional Orbiters, refurbishment of the Columbia after its use in the orbital flight test program and early operations, and conversion of the Orbiter structural test article to a flight operational Orbiter.
Document ID
19800067760
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Jones, S. C., Jr.
(NASA Johnson Space Center Engineering Office, Houston, Tex., United States)
Date Acquired
August 10, 2013
Publication Date
January 1, 1980
Subject Category
Space Transportation
Meeting Information
Meeting: A new era in technology
Location: Cocoa Beach, FL
Start Date: April 30, 1980
End Date: May 2, 1980
Accession Number
80A51930
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available