Coal gasification systems engineering and analysis. Volume 1: Executive summaryFeasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.
Document ID
19810009687
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
December 31, 1980
Subject Category
Propellants And Fuels
Report/Patent Number
NASA-CR-161653
BDM/H-80-800-TR-VOL-1
Report Number: NASA-CR-161653
Report Number: BDM/H-80-800-TR-VOL-1
Accession Number
81N18212
Funding Number(s)
CONTRACT_GRANT: NAS8-33824
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available