NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Coal gasification systems engineering and analysis. Appendix B: Medium B+U gas designA four module, 20,000 TPD, based on KT coal gasification technology was designed. The plant processes Kentucky No. 9 coal with provisions for up to five percent North Alabama coal. Medium BTU gas with heat content of 305 BTU/SCF and not more than 200 ppm sulfur is the primary plant product. Sulfur is recovered for scale as prilled sulfur. Ash disposal is on site. The plant is designed for zero water discharge. Trade studies provided the basis for not using boiler produced steam to drive prime movers. Thus process derived steam in excess of process requirements in superheated for power use in prime movers. Electricity from the TVA grid is used to supply the balance of the plant prime mover power requirements. A study of the effect of mine mouth coal cleaning showed that coal cleaning is not an economically preferred route. The design procedure involved defining available processes to meet the requirements of each system, technical/economic trade studies to select the preferred processes, and engineering design and flow sheet development for each module. Cost studies assumed a staggered construction schedule for the four modules beginning spring 1981 and a 90% on stream factor.
Document ID
19810009690
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
December 31, 1980
Subject Category
Propellants And Fuels
Report/Patent Number
BDM/H-80-800-TR-APP-B
NASA-CR-161656
Report Number: BDM/H-80-800-TR-APP-B
Report Number: NASA-CR-161656
Accession Number
81N18215
Funding Number(s)
CONTRACT_GRANT: NAS8-33824
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available