NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Coal gasification systems engineering and analysis. Appendix E: Cost estimation and economic evaluation methodologyThe cost estimation and economic evaluation methodologies presented are consistent with industry practice for assessing capital investment requirements and operating costs of coal conversion systems. All values stated are based on January, 1980 dollars with appropriate recognition of the time value of money. Evaluation of project economic feasibility can be considered a two step process (subject to considerable refinement). First, the costs of the project must be quantified and second, the price at which the product can be manufacturd must be determined. These two major categories are discussed. The summary of methodology is divided into five parts: (1) systems costs, (2)instant plant costs, (3) annual operating costs, (4) escalation and discounting process, and (5) product pricing.
Document ID
19810009693
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
December 31, 1980
Subject Category
Propellants And Fuels
Report/Patent Number
BDM/H-80-800-TR-APP-E
NASA-CR-161659
Report Number: BDM/H-80-800-TR-APP-E
Report Number: NASA-CR-161659
Accession Number
81N18218
Funding Number(s)
CONTRACT_GRANT: NAS8-33824
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available