Cell module and fuel conditionerMeasurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.
Document ID
19810009969
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Hoover, D. Q., Jr.
(Westinghouse Research and Development Center Pittsburgh, PA, United States)
Date Acquired
September 4, 2013
Publication Date
October 1, 1980
Subject Category
Energy Production And Conversion
Report/Patent Number
NASA-CR-165189
DOE/NASA/0161-5
REPT-80-9E6-MARED-R4
QR-4
Report Number: NASA-CR-165189
Report Number: DOE/NASA/0161-5
Report Number: REPT-80-9E6-MARED-R4
Report Number: QR-4
Accession Number
81N18494
Funding Number(s)
CONTRACT_GRANT: DE-AI03-79ET-11272
CONTRACT_GRANT: DEN3-161
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available