Fracture control plan for propellant and pressurant tanksTo assure the functional integrity of the GLL-RPM fuel and pressurized gas tank, all activities during entire lifetime of the tank, from manufacture to the end of the mission, must be monitored. Specifications are given for all procedures which influence the tank structure including design, manufacture, cleaning, test operations, and storage. Tests to be conducted to demonstrate that requirements of the fracture control plan are satisfied include static tests, cyclic load tests, proof tests, He-leak test, and acceptance tests.
Document ID
19810010961
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 4, 2013
Publication Date
February 1, 1981
Subject Category
Structural Mechanics
Report/Patent Number
NASA-TM-76554
Report Number: NASA-TM-76554
Accession Number
81N19488
Funding Number(s)
CONTRACT_GRANT: NASW-3198
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available