NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 4, appendix C: Identification from utility visits of present and future approaches to integration of DSG into distribution networksVisits to four utilities concerned with the use of DSG power sources on their distribution networks yielded useful impressions of present and future approaches to the integration of DSGs into electrical distribution network. Different approaches to future utility systems with DSG are beginning to take shape. The new DSG sources will be in decentralized locations with some measure of centralized control. The utilities have yet to establish firmly the communication and control means or their organization. For the present, the means for integrating the DSGs and their associated monitoring and control equipment into a unified system have not been decided.
Document ID
19810012012
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
October 1, 1980
Subject Category
Energy Production And Conversion
Report/Patent Number
DOE/JPL-955456-1-VOL-4
JPL-9950-419-VOL-4
NASA-CR-164055
SRD-80-042-IV-VOL-4
Report Number: DOE/JPL-955456-1-VOL-4
Report Number: JPL-9950-419-VOL-4
Report Number: NASA-CR-164055
Report Number: SRD-80-042-IV-VOL-4
Accession Number
81N20541
Funding Number(s)
CONTRACT_GRANT: JPL-955456
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available