NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 5, appendix D: Cost-benefit considerations for providing dispersed storage and generation for electric utilitiesCost benefit considerations are extremely important in obtaining the acceptance of dispersed storage and generation (DSG) by the electric utilities. These considerations involved somewhat different economic analyses depending on whether the generation is utility, customer, or combined ownership. It is necessary to get acceptance of more easily understood methods for evaluating the economics of DSG because much of the benefits of DSG may accrue in the generation and transmission portions of the utility system while the costs tend to be centered in the distribution portion of that system. The influence of factors, such as reliability, capital costs, and other economic measures were also investigated.
Document ID
19810012013
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
October 1, 1980
Subject Category
Energy Production And Conversion
Report/Patent Number
JPL-9950-419-VOL-5
NASA-CR-164053
SRD-80-042-V-VOL-5
DOE/JPL-955456-1-VOL-5
Report Number: JPL-9950-419-VOL-5
Report Number: NASA-CR-164053
Report Number: SRD-80-042-V-VOL-5
Report Number: DOE/JPL-955456-1-VOL-5
Accession Number
81N20542
Funding Number(s)
CONTRACT_GRANT: JPL-955456
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available