NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Methodology for urban rail and construction technology research and development planningA series of transit system visits, organized by the American Public Transit Association (APTA), was conducted in which the system operators identified the most pressing development needs. These varied by property and were reformulated into a series of potential projects. To assist in the evaluation, a data base useful for estimating the present capital and operating costs of various transit system elements was generated from published data. An evaluation model was developed which considered the rate of deployment of the research and development project, potential benefits, development time and cost. An outline of an evaluation methodology that considered benefits other than capital and operating cost savings was also presented. During the course of the study, five candidate projects were selected for detailed investigation; (1) air comfort systems; (2) solid state auxiliary power conditioners; (3) door systems; (4) escalators; and (5) fare collection systems. Application of the evaluation model to these five examples showed the usefulness of modeling deployment rates and indicated a need to increase the scope of the model to quantitatively consider reliability impacts.
Document ID
19810015440
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Rubenstein, L. D.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Land, J. E.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Deshpande, G.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Dayman, B.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Warren, E. H.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
September 4, 2013
Publication Date
August 1, 1980
Subject Category
Urban Technology And Transportation
Report/Patent Number
UMTA-CA-06-0116-80-3
JPL-PUB-80-83
NASA-CR-164280
Report Number: UMTA-CA-06-0116-80-3
Report Number: JPL-PUB-80-83
Report Number: NASA-CR-164280
Accession Number
81N23975
Funding Number(s)
CONTRACT_GRANT: DOT-AT-800015
CONTRACT_GRANT: NAS7-100
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available