Design requirements for SRB production control system. Volume 4: ImplementationThe implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.
Document ID
19810023639
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
January 1, 1981
Subject Category
Space Transportation
Report/Patent Number
G-402-VOL-4
NASA-CR-161864
Report Number: G-402-VOL-4
Report Number: NASA-CR-161864
Accession Number
81N32182
Funding Number(s)
CONTRACT_GRANT: NAS8-34207
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available