NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Integrated command, control communication and computation system studyThe study was conducted in three phases: a functional requirements phase; a functional architecture phase; and a design plan phase. The major emphasis was on the functional architecture phase and the approaches used for its functional hierarchy, operations concept, and interfaces.
Document ID
19820002416
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
August 1, 1981
Subject Category
Communications And Radar
Report/Patent Number
NASA-CR-166738
Report Number: NASA-CR-166738
Accession Number
82N10289
Funding Number(s)
CONTRACT_GRANT: NAS5-26239
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available