NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedulesThe estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
Document ID
19820002622
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
September 1, 1981
Subject Category
Energy Production And Conversion
Report/Patent Number
DOE/NASA/0224-1-VOL-3
NASA-CR-165452-VOL-3
Report Number: DOE/NASA/0224-1-VOL-3
Report Number: NASA-CR-165452-VOL-3
Accession Number
82N10495
Funding Number(s)
CONTRACT_GRANT: DE-AI01-77ET-10769
CONTRACT_GRANT: DEN3-224
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available