NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant developmentA schematic and physical layout is given for the 5kW integrated system and the development status of individual components is described. The results of using a one dimensional mathematical model of the 5kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semiautomatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppm ethanol in the feed.
Document ID
19820008609
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
August 25, 1981
Subject Category
Energy Production And Conversion
Report/Patent Number
QR-2
NASA-CR-165455
DOE/NASA/0241-2
Report Number: QR-2
Report Number: NASA-CR-165455
Report Number: DOE/NASA/0241-2
Accession Number
82N16483
Funding Number(s)
CONTRACT_GRANT: DE-AI01-80ET-17088
CONTRACT_GRANT: DEN3-241
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available