NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Process development for automated solar cell and module production. Task 4: Automated array assemblyThe Unimate robot was programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. Mechanical construction of the Automated Lamination Station and Final Assembly Station were completed on schedule. All final wiring and interconnect cables were also completed and the first operational testing began. The final controlling program was written. A local fabricator was contracted to produce the glass reinforced concrete panels to be used for testing and deliverables. A video tape showing all three stations in operation was produced.
Document ID
19820016842
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Hagerty, J. J.
(Tracor MB Associates San Ramon, CA, United States)
Date Acquired
September 4, 2013
Publication Date
July 15, 1981
Subject Category
Energy Production And Conversion
Report/Patent Number
MB-R-81/11
NASA-CR-168922
DOE/JPL-955699-81/04
JPL-9950-574
NAS 1.26:168922
QR-4
Report Number: MB-R-81/11
Report Number: NASA-CR-168922
Report Number: DOE/JPL-955699-81/04
Report Number: JPL-9950-574
Report Number: NAS 1.26:168922
Report Number: QR-4
Accession Number
82N24718
Funding Number(s)
CONTRACT_GRANT: JPL-955699
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available