NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Process development for automated solar cell and module production. Task 4: Automated array assemblyThe cell preparation station was installed in its new enclosure. Operation verification tests were performed. The detailed layout drawings of the automated lamination station were produced and construction began. All major and most minor components were delivered by vendors. The station framework was built and assembly of components begun.
Document ID
19820016843
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Hagerty, J. J.
(Tracor MB Associates San Ramon, CA, United States)
Date Acquired
September 4, 2013
Publication Date
January 15, 1981
Subject Category
Energy Production And Conversion
Report/Patent Number
NAS 1.26:168923
QR-2
MBR-81/01
DOE/JPL-955600-81/02
NASA-CR-168923
JPL-9950-475
Report Number: NAS 1.26:168923
Report Number: QR-2
Report Number: MBR-81/01
Report Number: DOE/JPL-955600-81/02
Report Number: NASA-CR-168923
Report Number: JPL-9950-475
Accession Number
82N24719
Funding Number(s)
CONTRACT_GRANT: JPL-955699
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available