NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
FSA field testThe 12 continental remote sites were decommissioned. Testing was consolidated into a five-site network consisting of the four Southern California sites and a new Florida site. 16 kW of new state-of-the-art modules were deployed at the five sites. Testing of the old modules continued at the Goldstone site but as a low-priority item. Array testing of modules is considered. Additional new testing capabilities were added. A battery-powered array data logger is discussed. A final set of failure and degradation data was obtained from the modules.
Document ID
19820017762
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Jaffe, P.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Weaver, R. W.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Lee, R. E.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
September 4, 2013
Publication Date
December 15, 1981
Subject Category
Energy Production And Conversion
Report/Patent Number
NAS 1.26:168991
JPL-PUB-81-99
DOE/JPL-1012-59
NASA-CR-168991
Report Number: NAS 1.26:168991
Report Number: JPL-PUB-81-99
Report Number: DOE/JPL-1012-59
Report Number: NASA-CR-168991
Accession Number
82N25638
Funding Number(s)
CONTRACT_GRANT: NAS7-100
CONTRACT_GRANT: DE-AI01-76ET-20356
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available