NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Sonic boom measurement test plan for Space Shuttle STS-2 reentryProcedures and system specifications associated with the space shuttle STS-2 sonic boom measurement program are described. Specifically included are details such as mobile data acquisition station locations, measurement systems calibration levels, predicted sonic boom overpressure levels, overpressure level assignment for each data acquisition station, data recording times on and off, universal coordinate time, and measurement system descriptions.
Document ID
19820026310
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Henderson, H. R.
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
September 4, 2013
Publication Date
November 1, 1981
Subject Category
Acoustics
Report/Patent Number
NASA-TM-84858
NAS 1.15:84858
Report Number: NASA-TM-84858
Report Number: NAS 1.15:84858
Accession Number
82N34186
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available