NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Shuttle progress reportA status report on the development of the Space Shuttle system is presented, with emphasis on the system capability, the major objectives accomplished during the development period, the Orbital Flight Test program, and the STS-1 mission profile. The system incorporates virtually all of the characteristics and requirements initially established as design goals over a decade ago: both the system and the solid rocket booster are reusable; the orbiter, a delta wing vehicle, is capable of aerodynamic cross-range in excess of 1,100 nautical miles and has an approximate 4,000 nautical mile down-range capability; the flight control system and software provide various abort modes, and the orbiter crew compartment is designed for a shirt-sleeve environment; the main liquid fuel engines provide 470,000 pounds of thrust at vacuum, and the payload lift capacity is 65,000 pounds to a 150 nautical mile orbit.
Document ID
19820028992
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Thompson, R. F.
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Verrengia, A. A.
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
August 10, 2013
Publication Date
January 1, 1981
Subject Category
Space Transportation
Meeting Information
Meeting: In: The year of the Shuttle
Location: Cocoa Beach, FL
Start Date: April 29, 1981
End Date: May 1, 1981
Accession Number
82A12527
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available