NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.
Document ID
19830002886
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
December 17, 1981
Subject Category
Astronautics (General)
Report/Patent Number
MPS.6-81-223-VOL-3-PT-2
NASA-CR-170646
NAS 1.26:170646
Report Number: MPS.6-81-223-VOL-3-PT-2
Report Number: NASA-CR-170646
Report Number: NAS 1.26:170646
Accession Number
83N11156
Funding Number(s)
CONTRACT_GRANT: NAS8-33688
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available