NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Develop and test fuel cell powered on-site integrated total energy systemSatisfactory performance is reported for the first 12-cell sub-stack of the 5 kW rebuild using improved ABA reactant distribution plates. Construction and test results are described for the first full-sized single-cell test (0.33 m x 0.56 m). Test duration was 450 hours. Plans are outlined for construction and testing of two methanol reformer units based on commercially-available shell-and-tube heat exchangers. A 5 kW-equivalent precursor and a 50 kW-equivalent prototype will be built. Supporting design and single-tube experimental data are presented. Stack support efforts are summarized on corrosion currents of graphite materials and acid-management of single-cell test facilities. Comparative properties are summarized for the two methanol/steam reforming catalysts evauated under Task V (now completed); T2107RS and C70-2RS.
Document ID
19830007568
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Kaufman, A.
(Engelhard Industries, Inc. Edison, NJ, United States)
Johnson, G. K.
(Engelhard Industries, Inc. Edison, NJ, United States)
Date Acquired
September 4, 2013
Publication Date
November 3, 1982
Subject Category
Energy Production And Conversion
Report/Patent Number
QR-5
NAS 1.26:168020
NASA-CR-168020
Report Number: QR-5
Report Number: NAS 1.26:168020
Report Number: NASA-CR-168020
Accession Number
83N15839
Funding Number(s)
CONTRACT_GRANT: DEN3-241
CONTRACT_GRANT: DE-AI01-80ET-17088
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available