WTS-4 system verification unit for wind/hydroelectric integration studyThe Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.
Document ID
19830010996
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Watts, A. W.
(Bureau of Reclamation Denver, CO, United States)
Date Acquired
August 11, 2013
Publication Date
January 1, 1982
Publication Information
Publication: NASA. Lewis Research Center Large Horizontal-Axis Wind Turbines
Subject Category
Energy Production And Conversion
Accession Number
83N19267
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available