Space Transportation System Mission STS-7The second flight of Challenger was another exceptional flight in that 11 major objectives were accomplished. The TELESAT-F and PALAPA-B1 were deployed exactly on time. The SPAS-01 attached and detached operations went extremely well despite some heating problems with the SPAS. The OSTA-2 experiments for the Material Experiments Assembly and Material Wissenschaftliche Autone Unter Schwerelosigkeit were activated as planned with no indications of anomalies, and the MLR and CFES experiment packages in the middeck area were operated by the crew as planned. Ninety-six percent (56 of 58) of the assigned flight test objectives were completed. The turnaround time was accomplished in the least time to date (only 99.5 hours) and the return to KSC was completed with a total of only 5 days loss of program time.
Document ID
19830023440
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 4, 2013
Publication Date
August 5, 1983
Subject Category
Space Transportation
Report/Patent Number
M-989-03-07
NAS 1.15:85337
NASA-TM-85337
Report Number: M-989-03-07
Report Number: NAS 1.15:85337
Report Number: NASA-TM-85337
Accession Number
83N31711
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available