NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Maintenance estimation methodologyA Rayleigh curve method of projection combined with a modified matrix method to forecast maintenance needs and required staffing levels is used. The curves generated by both methods are differenced to ascertain how much new work can be performed given the staffing live. Actual project data are compared to the projection to validate or modify the process.
Document ID
19830024096
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Rone, K. Y.
(IBM Federal Systems Div. Houston, TX, United States)
Date Acquired
August 11, 2013
Publication Date
December 1, 1982
Publication Information
Publication: NASA. Goddard Space Flight Center Proc. of the 7th Ann. Software Eng. Workshop
Subject Category
Computer Programming And Software
Accession Number
83N32367
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available