NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
STS cargo processing at the Kennedy Space CenterSpace Shuttle-related payload processing operations at the Kennedy Space Center have resulted in a major increase in the number of items being simultaneously processed, with two or more intermediate spacecraft being prepared, along with several smaller payload items, for launch on the same mission. When full operational status is achieved, some elements of three or more Space Shuttle flight cargoes will undergo processing at the Center simultaneously. It is also expected that long lead time items will often arrive earlier than those requiring a shorter checkout span. These and other complications due to the progressive increase in the scale of operations have prompted facility modifications, new operational procedures, and advance planning.
Document ID
19830046257
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Rock, W. H.
(NASA Kennedy Space Center Cargo Projects Office, Cocoa Beach, FL, United States)
Date Acquired
August 11, 2013
Publication Date
January 1, 1982
Subject Category
Ground Support Systems And Facilities (Space)
Meeting Information
Meeting: Shuttle propulsion systems; Winter Annual Meeting
Location: Phoenix, AZ
Start Date: November 14, 1982
End Date: November 19, 1982
Accession Number
83A27475
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available