NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Processing cargoes for the first two operational STS flights at KSCPayload and spacecraft check-out procedures followed at Kennedy Space Center (KSC) are described, and examples are furnished of Shuttle missions STS-5 and -6. Reliability must be assured in order to account for isolated operation in GEO once the satellites are released from the Orbiter. The spacecraft processing is handled in distinct flows that depend on the type of boost engine attached, e.g., the PAM-A, -D, or the IUS. Interface verification occurs in the Vehicle Processing Facility (VPF), which is equipped to store the payloads until an Orbiter is ready. Spacecraft are assigned to their respective processing lines by the Launch Site Support Manager. The STS-5 Orbiter was fitted with Getaway Specials, the SBS-C satellite, and the Anik-C spacecraft, and STS-6 carried the TDRSS-A spacecraft, which was mated to an IUS, three Getaway Specials, and two experiments for the pressurized cabin. The time necessary for preparing payloads is intended eventually to be reduced to 3 weeks.
Document ID
19830066018
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Neilon, J. J.
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Date Acquired
August 11, 2013
Publication Date
October 1, 1983
Subject Category
Ground Support Systems And Facilities (Space)
Report/Patent Number
IAF PAPER 83-23
Report Number: IAF PAPER 83-23
Accession Number
83A47236
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available