NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Flight evaluation of the DEEC secondary control air-start capabilityThe air-start capability of a secondary engine control (SEC) was tested for a DEEC-equipped F100 engine and installed in an F-15 airplane. Two air-start schedules were tested. The first was referred to as the group I schedule; the second or revised schedule was the group II start schedule. Using the group I start schedule, an airspeed of 300 knots was required to ensure successful 40- and 25-percent SEC-mode air starts. If N2 were less than 40 percent, a stall would occur when the start bleeds closed 40 sec after initiation of the air start. All JFS-assisted air starts were successful with the group start schedule. For the group II schedule, the time between pressurization and start-bleed closure ranged between 50 and 72 sec depending on altitude. All air starts were successful above 225 knots givin a 75-knot reduction in required airspeed for a successful air start. Spooldown air starts of 40 percent were successful at 200 knots at altitudes up to 10,650 m and at 175 knots at altitudes up to 6100 m. Idle rpm was lower than the desired 65 percent for air starts at higher altitudes and lower airspeeds. All JSF-assisted air starts were successful.
Document ID
19840010135
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Johnson, J. B.
(NASA Ames Research Center Moffett Field, CA, United States)
Nelson, J.
(NASA Ames Research Center Moffett Field, CA, United States)
Date Acquired
September 4, 2013
Publication Date
December 1, 1983
Subject Category
Aircraft Propulsion And Power
Report/Patent Number
H-1186
NAS 1.15:84910
NASA-TM-84910
Report Number: H-1186
Report Number: NAS 1.15:84910
Report Number: NASA-TM-84910
Accession Number
84N18203
Funding Number(s)
PROJECT: RTOP 532-02-21
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available