NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmaticsThe cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.
Document ID
19840010236
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
April 20, 1983
Subject Category
Launch Vehicles And Space Vehicles
Report/Patent Number
NASA-CR-173320
SA-SSP-RP008-VOL-2-BK-3
NAS 1.26:173320
Report Number: NASA-CR-173320
Report Number: SA-SSP-RP008-VOL-2-BK-3
Report Number: NAS 1.26:173320
Accession Number
84N18304
Funding Number(s)
CONTRACT_GRANT: NASW-3685
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available