Operational experience with the National Transonic FacilityConstruction of the National Transonic Facility was completed in September 1982. The checkout of all systems required about one year. The facility operated to the design point of 120 million Reynolds number based on a 0.25 meter chord at a Mach number of 1.0. Performance of all systems was basically as expected. Setup for the detailed aerodynamic calibration begins late in 1983, and the calibration is expected to be complete by the last quarter of 1984.
Document ID
19840015497
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Mckinney, L. W.
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
August 12, 2013
Publication Date
February 1, 1984
Publication Information
Publication: AGARD Wind Tunnels and Testing Tech.
Subject Category
Research And Support Facilities (Air)
Accession Number
84N23565
Distribution Limits
Public
Copyright
Other
Document Inquiry

Available Downloads

There are no available downloads for this record.
No Preview Available