Space station needs, attributes, and architectural options: Space station program cost analysisThis report documents the principal cost results (Task 3) derived from the Space Station Needs, Attributes, and Architectural Options study conducted for NASA by the McDonnell Douglas Astronautics Company. The determined costs were those of Architectural Options (Task 2) defined to satisfy Mission Requirements (Task 1) developed within the study. A major feature of this part of the study was the consideration of realistic NASA budget constraints on the recommended architecture. Thus, the space station funding requirements were adjusted by altering schedules until they were consistent with current NASA budget trends.
Document ID
19840019721
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Cowls, R. S.
(McDonnell-Douglas Astronautics Co. Huntington Beach, CA, United States)
Goodwin, A. J.
(McDonnell-Douglas Astronautics Co. Huntington Beach, CA, United States)
Date Acquired
September 4, 2013
Publication Date
April 1, 1983
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
MDC-H0541
NAS 1.26:173696
NASA-CR-173696
Report Number: MDC-H0541
Report Number: NAS 1.26:173696
Report Number: NASA-CR-173696
Accession Number
84N27790
Funding Number(s)
CONTRACT_GRANT: NASW-3687
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available