NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Status tracking system for reportsThe program DGR03 Status of Langley Formal Reports was developed to aid the Research Information and Application Division (RIAD) in tracking the progress of NASA formal reports through the review cycle. This review cycle was established by Langley Management as a control for Langley's final product: its research reports. The cycle is divided into 5 main stages with substages in each. The cycle can be completed in 165 days. This program has been an aid to RIAD in eliminating manual calculation, providing visible data for everyone concerned with report processing, eliminating the need to telephone divisions when reports are delinquent. The program can also provide information on the number of reports in any stage of the system at any period.
Document ID
19840025205
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Huffman, J. P.
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
August 12, 2013
Publication Date
September 1, 1984
Publication Information
Publication: NASA, Washington NASA Admin. Data Base Management Systems, 1984
Subject Category
Documentation And Information Science
Accession Number
84N33276
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available