Ground test article for deployable space structure systemsThe ground test article fabrication and assembly plan was completed by Santek Engineering, Inc. The plan was reviewed and accepted by Rockwell during an on-site visit to the Santek facility. Raw material and hardware orders were placed by Santek in July. Approximately 98% of the raw materials and 10% of the hardware deliveries have been completed. Several material and hardware substitutions were requested by Santek due to no-bid responses from suppliers or excessive costs for limited quantity items. These substitutions were evaluated and approved by Rockwell Engineering and Material and Process and are being incorporated into the drawing package. Santek started fabrication of detail parts in mid-August. Their current resource utilization is at approximately 50% of the planned eventual commitment and is increasing at a rate commensurate with the fabrication and assembly plan. At this writing, Santek's estimate of completion is 03%. During verification testing of the diagonal member joint, in a program funded by Rockwell discretionary funds, the axial load to unlock the joint was found to increase significantly after a few cycles of operation. This was attributed to galling, poor lubrication, and locking pin geometry. A change of materials, lubricant, and modification of the pin geometry reduced the unlocking load and provided repeatability after 50 cycles of operation. This new design is being implemented into the ground test article.
Document ID
19840026386
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Malloy, G. D.
(Rockwell International Corp. Pittsburgh, PA, United States)
Date Acquired
September 4, 2013
Publication Date
September 1, 1984
Subject Category
Ground Support Systems And Facilities (Space)
Report/Patent Number
NAS 1.26:171158
NASA-CR-171158
BMPR-3
Report Number: NAS 1.26:171158
Report Number: NASA-CR-171158
Report Number: BMPR-3
Accession Number
84N34457
Funding Number(s)
CONTRACT_GRANT: NAS8-34657
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.