NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Control system testingA three stage process of ground testing of the Space Telescope Pointing Control System is used for verification prior to on-orbit operation. First, development tests are conducted in a laboratory environment using flight/engineering model control sensor and actuators configured with an engineering model of the flight computer and data management system breadboards. These development tests validate the results of computer simulations predicting control system performance. Integration tests bring together flight system elements and software interfaced to a software simulation of vehicle dynamics to confirm closed loop performance. The final ground test phase, flight systems testing, is conducted on the fully assembled Space Telescope, verifies interfaces with the Fine Guidance Sensors and includes a thermal vacuum testing period. During the final test phase, the Point Control System is exercised with the dynamics simulator running in real time.
Document ID
19840047775
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Whittler, W. H.
(Lockheed Missiles and Space Co. Sunnyvale, CA, United States)
Collart, R. E.
(Lockheed Missiles and Space Co., Inc. Sunnyvale, CA, United States)
Date Acquired
August 12, 2013
Publication Date
January 1, 1984
Subject Category
Spacecraft Instrumentation
Report/Patent Number
AAS PAPER 83-366
Report Number: AAS PAPER 83-366
Accession Number
84A30562
Funding Number(s)
CONTRACT_GRANT: NAS8-32697
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available