NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Advisory – Planned Maintenance: On Monday, July 15 at 9 PM Eastern the STI Compliance and Distribution Services will be performing planned maintenance on the STI Repository (NTRS) for approximately one hour. During this time users will not be able to access the STI Repository (NTRS).

Back to Results
Results of the M.I.T. Beam Assembly Teleoperator and Integrated Control StationTo examine the issues of optimum human-machine mixtures for orbital assembly operations, a full six degree-of-freedom teleoperator system for assembly of large space structures has been developed by the Space Systems Laboratory. This consists of a free-flying neutrally buoyant Beam Assembly Teleoperator (BAT) with two manipulators, and a modular Integrated Control Station (ICS). The design and configuration of both the BAT and the ICS are described in some detail in this paper. In addition, qualitative results from early tests of the system are presented. These tests concentrated mostly on free-flying operations and grasping. Future tests will involve complete teleoperated assembly.
Document ID
19840060653
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Spofford, J. R.
(Massachusetts Inst. of Tech. Cambridge, MA, United States)
Akin, D. L.
(MIT Cambridge, MA, United States)
Date Acquired
August 12, 2013
Publication Date
January 1, 1984
Subject Category
Man/System Technology And Life Support
Report/Patent Number
AIAA PAPER 84-1890
Accession Number
84A43440
Funding Number(s)
CONTRACT_GRANT: NAGW-21
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available