NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Power subsystem automation studyThe purpose of the phase 2 of the power subsystem automation study was to demonstrate the feasibility of using computer software to manage an aspect of the electrical power subsystem on a space station. The state of the art in expert systems software was investigated in this study. This effort resulted in the demonstration of prototype expert system software for managing one aspect of a simulated space station power subsystem.
Document ID
19850003991
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Tietz, J. C.
(Martin Marietta Aerospace Denver, CO, United States)
Sewy, D.
(Martin Marietta Aerospace Denver, CO, United States)
Pickering, C.
(Martin Marietta Aerospace Denver, CO, United States)
Sauers, R.
(Martin Marietta Aerospace Denver, CO, United States)
Date Acquired
September 5, 2013
Publication Date
September 1, 1984
Subject Category
Electronics And Electrical Engineering
Report/Patent Number
MCR-84-596
NASA-CR-171213
NAS 1.26:171213
Report Number: MCR-84-596
Report Number: NASA-CR-171213
Report Number: NAS 1.26:171213
Accession Number
85N12299
Funding Number(s)
CONTRACT_GRANT: NAS8-34938
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available