NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
External tank processing from barge to padDelivery and launch readiness events for the External Tanks (ET) are discussed. The ET is off-loaded at the KSC Barge Turning Basin and towed to the Vertical Assembly Building (VAB), High Bay Transfer Aisle. It is erected vertically and placed in the ET Checkout Area of High Bay 2 or 4 for standalone checkout. At the completion of checkout the ET is transferred to storage or to the Integration Area of High Bay 1 or 3 for SRB and Orbiter Mate. A Systems Integration Test performed with the Orbiter and Solid Rocket Booster is described. Final checkout activities are also described.
Document ID
19850008618
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Carpenter, J. E.
(Martin Marietta Corp. Cocoa Beach, FL, United States)
Date Acquired
August 12, 2013
Publication Date
January 1, 1985
Publication Information
Publication: NASA. Johnson Space Center Space Shuttle Tech. Conf., Pt. 1
Subject Category
Space Transportation
Accession Number
85N16927
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available