X-ray satelliteA mock-up for the development of the Engineering Model (EM) and Flight Model (FM) is introduced which shortens the delay of 7 weeks regarding the previous planned launch date of September 30, to about 3 weeks maintaining the 4 weeks reserve is discussed. As compared with the new assembly integration test (EM-AIT) schedule of March 11, 1985, the EM data handling system is on the critical path. For the attitude measurement and control subsystem, sufficiently flexibility is achieved through combination of dummies and EM hardware to catch up with the existing delays.
Document ID
19850022831
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 5, 2013
Publication Date
June 1, 1985
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NASA-TM-77898
NAS 1.15:77898
DFVLR-WF2/8346
Report Number: NASA-TM-77898
Report Number: NAS 1.15:77898
Report Number: DFVLR-WF2/8346
Accession Number
85N31144
Funding Number(s)
CONTRACT_GRANT: NASW-4005
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available