X-ray satelliteThe projected launch date has been delayed approx. 7 weeks from the planned launch date. The Engineering Model (EM) of the automatic measurement and control system (AMCS) is in the critical phase. The contract change no. 1 to the main contract has been signed. A new version of the welding seam location specifications for the wide field camera (WFC) was proposed by the WFC Consortium. The payload integration plan (PIP) has been signed. Production of the EM/QM prototype and ground station equipment has proceeded according to plan with the exception of some delays. Production of the EM equipment has begun. Preparations for the qualification tests of the EM/QM equipment and the integration of EM equipment has begun. The cause of the delay in the launch date include the combined effects of the postponement of the target date for the EM equipment, along with the fact that only a structural model is available.
Document ID
19850022832
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 5, 2013
Publication Date
May 1, 1985
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NAS 1.15:77882
NASA-TM-77882
DFVLR-WF2/7804
Report Number: NAS 1.15:77882
Report Number: NASA-TM-77882
Report Number: DFVLR-WF2/7804
Accession Number
85N31145
Funding Number(s)
CONTRACT_GRANT: NASW-4004
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available