NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Shuttle Main Engine overhaul programThe Space Shuttle Main Engine first flight set from the Orbiter Columbia was returned to Rockwell International/Rocketdyne Division in Canoga Park, California for overhaul after five successful development flights. The three main engines have been completely disassembled and the hardware assessed for space flight effects. Schedules to overhaul subsequent flight engines have been established based on operational requirements of the Space Transportation System. To support these requirements, a dedicated Space Shuttle Main Engine Overhaul Center is being built at the Canoga Park Rocketdyne Facility incorporating the latest in manufacturing, inspection, and data processing equipment.
Document ID
19850057120
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Stohler, S.
(Rockwell International Corp. Canoga Park, CA, United States)
Matus, M.
(Rockwell International Corp. Rocketdyne Div., Canoga Park, CA, United States)
Date Acquired
August 12, 2013
Publication Date
January 1, 1984
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
SAE PAPER 841625
Report Number: SAE PAPER 841625
Meeting Information
Meeting: Space systems technology
Location: Long Beach, CA
Start Date: October 15, 1984
End Date: October 18, 1984
Accession Number
85A39271
Funding Number(s)
CONTRACT_GRANT: NAS8-27980
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available