X-ray satelliteAn overview of the second quarter 1985 development of the X-ray satellite project is presented. It is shown that the project is proceeding according to plan and that the projected launch date of September 9, 1987 is on schedule. An overview of the work completed and underway on the systems, subsystems, payload, assembly, ground equipment and interfaces is presented. Problem areas shown include cost increases in the area of focal instrumentation, the star sensor light scattering requirements, and postponements in the data transmission subsystems.
Document ID
19860000806
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 5, 2013
Publication Date
September 1, 1985
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NASA-TM-77923
NAS 1.15:77923
DFVLR-WF2/8734
Report Number: NASA-TM-77923
Report Number: NAS 1.15:77923
Report Number: DFVLR-WF2/8734
Accession Number
86N10273
Funding Number(s)
CONTRACT_GRANT: NASW-4006
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available