Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant developmentTwo 25 cell stacks of the 13 inch x 23 inch cell size (about 4kW) remain on test after 4000 hours and 2900 hours, respectively, using simulated reformate fuel. These tests are focusing on the durability of fuel cell stack components developed through the end of 1983. Also, these stacks are serving as forerunners of a 25kW stack that will contain 175 cells of the same size and will employ the same technology base. The stack technology development program has focused on a new, low cost bipolar plate edge seal technique and evaluation of advanced cathode catalysts, an electrolyte replenishment system, and nonmetallic cooling plates in small stacks.
Document ID
19860003289
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Kaufman, A.
(Engelhard Corp. Edison, NJ, United States)
Pudick, S.
(Engelhard Corp. Edison, NJ, United States)
Wang, C. L.
(Engelhard Corp. Edison, NJ, United States)
Werth, J.
(Engelhard Corp. Edison, NJ, United States)
Whelan, J. A.
(Engelhard Corp. Edison, NJ, United States)
Date Acquired
September 5, 2013
Publication Date
May 17, 1985
Subject Category
Energy Production And Conversion
Report/Patent Number
NASA-CR-174948
DOE/NASA-0241-15
QR-14
NAS 1.26:174948
Report Number: NASA-CR-174948
Report Number: DOE/NASA-0241-15
Report Number: QR-14
Report Number: NAS 1.26:174948
Accession Number
86N12757
Funding Number(s)
CONTRACT_GRANT: DE-AI01-80ET-17088
CONTRACT_GRANT: DEN3-241