NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Advanced on-site power plant development technology programA 30-cell, full area short stack containing advanced cell features was tested for 2900 hours. A stack acid addition approach was selected and will be evaluated on the stack at 5000 hours test time. A brassboard inverter was designed and fabrication was initiated. Evaluation of this brassboard inverter will take place in 1984. A Teflon coated commercial heat exchanger was selected as the preferred approach for the acid condenser. A reformer catalyst with significantly less pressure drop and equivalent performance relative to the 40-K baseline catalyst was selected for the development reformer. The early 40-kW field power plant history was reviewed and adjustments were made to the On-Site Technology Development Program to address critical component issues.
Document ID
19860015569
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 5, 2013
Publication Date
June 1, 1984
Subject Category
Energy Production And Conversion
Report/Patent Number
DOE/NASA/0289-1
NAS 1.26:174709
NASA-CR-174709
PSD-FCR-5715
Report Number: DOE/NASA/0289-1
Report Number: NAS 1.26:174709
Report Number: NASA-CR-174709
Report Number: PSD-FCR-5715
Accession Number
86N25040
Funding Number(s)
CONTRACT_GRANT: DE-AI21-80ET-17088
CONTRACT_GRANT: DEN3-289
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available